Camp Dudley Master Plan, Westport, NY. 2012
Planting master plan and site design for YMCA Boys Camp on Lake Champlain. A phased planting strategy, designed to heal and stabilize 500’ of restored slope, using native plants compatible with the site and ecosystem of Lake Champlain. The plan enhances lake views, new and existing, and mitigates the impact of retaining walls along the shore. A realignment and regrading of pathways in order to reduce erosion and encourage re-vegetation.
Engineer: Engineering Ventures
Go back to all institutional projects